Putting your best foot forward - Best Practices in Consumer Indexing

As the operator tries rolling out the services, the foremost task at-hand is creating the base-line for the utility. This, typically, is collated using a consumer survey called consumer indexing (CI). The operator main aim is to collect the information required for consumer demography and demand estimation.

The figure below shows the variety of data the consumer indexing, if designed properly, can yield:

Consumer Indexing - Why is it important?

Here's the catch though.

Since the consumer indexing process is an extensive full-city activity, our observation has been that it becomes extremely important for the operator to monitor the survey process continuously and ensure data accuracy.

Some of the Critical Factors for Success (CFS) for successful consumer indexing survey are listed below:

  1. S.M.A.R.T. Goals: It is very important for the operator to upfront decide the data he wants to collect as a part of the consumer indexing process. The goals need to be identified across the teams which are going to be the users of the data collected. At the same time, the goals need to be clearly defined to the survey vendor so as to apprise him of the data usage. During our engagement with our clients, we have noticed that not much is done in documenting all the teams' requirements right in the beginning. We strongly recommend writing up a  well defined Data Requirement Document (DRD). It not only becomes one of the most important pillars of the CI Process but also avoids endless discussions between teams on what is required, by whom and by when.
  2. Data collection methodology and medium: The operator should identify all the options available to select the best suited methodology to collect the data identified in the goals of the CI process. In the same step, the operator should also develop and design the medium, usually a survey form, for the CI process. The "wow" effect of the survey form design changes and improved efficiency of the consumer interview was observed when we re-designed the survey form from a functional flow question to a consumer interaction flow.
  3. Well Defined Technical Specifications: The geo-spatial information being collected in the consumer indexing requires high end technical inputs to be ready for the survey before the start of the survey. These specifications include the likes of a high resolution satellite image of the area under survey, clear definitions of boundaries of zones and sub-zones (if any), etc.
  4. Appropriate Data Validation Rules (DVR): Once the DRD and Technical spcs are frozen, the operator should identify for itself the validation rules he needs to apply to check the data being collected by the CI vendor. Inappropriate or too rigid validation rules lead either to mass rejection or too poor quality of data being collected.
  5. Vendor Selection and Engagement: Identifying a vendor capable of delivering the DRD as per the pre-set data standards becomes the core of the CI project execution. As much important it is to identify the correct vendor, it is also the operator's responsibility to engage the vendor in a manner where the CI process can be handled in a smooth and timely manner.
  6. Design and Deployment of Project Management Techniques: The CI activity usually spans a substantial period of time. This necessiates deployment of a Project Management team which is well versed with the DRD and Data Collection methodology. A well formed PM team with participation across stakeholder teams forms one of the important CFS for CI Process. The KRAs of the PM team should include Unitization of Work, Timeline planning, Progress monitoring, etc.
  7. Business Process Management: The operator should be engaging in monitoring of not just the data being collected, but also the vendor processes. This, in the long term, helps the operator to achieve more accurate and timely data. Independent audits of internal as well as vendor processes always helps.
The data collected through CI process forms the base-line for the operator to put its plans (CapEx, OpEx, Revenue Planning) in place. Therefore, we believe, the onus of successful execution of the CI process is as much on the operator as it is for the survey vendor.

Saturday, September 3, 2011

Rural Franchisees - Could they become pilot ground to raise next level of Distribution services?

A recent publication from Prayas on 'Rajiv Gandhi Rural Electrification Program - Urgent need for mid-course correction' gave a very good overview of RGGVY program, its features and progress. Some key observations made:
  1. Total 1.1 lakhs Rural Franchisees in India (detailed distribution given below)
    • This covers only 19% of total villages in the country including both the RGGVY and non-RGGVY villages 
    • Only 38% RGGVY villages are covered under Franchisees, when all are supposed to have mandatory Rural Franchisees
    • 95% of total Rural Franchisees are Revenue Collection based Franchisees
    • Bihar, Gujarat (91%), Haryana (91%), Karnataka (73%), Nagaland, UP and West Bengal have above national average (i.e. 19%) Rural Franchisees in RGGVY villages
  2. Rs. 26000 cr. already spent in last 6 years since 2005 and estimated another same amount to be spent (totaling to Rs. 52000 cr.) for coverage of RGGVY original targets of 100% village electrification and 2.34 cr. rural BPL household connections.
    • Since 2005, 96562 villages have been electrified raising the level of ‘village electrification ’ from 74% to 91%. (Total villages in India is ~6 lacs, out of which 1.25 lacs did not have access to electricity in 2005)
    • Since 2005, 1.75 crores rural households are given new connections raising the level of ‘rural household electrification’ from 43% to 56%. (Total # of rural households in India is ~14.5 crores, out of which 7.8 crores did not have access to electricity in 2005)
  3. By estimate of investment, of order Rs. 52000 cr., RGGVY scheme is comparable to R-APDRP scheme of GoI. 
State-wise Rural Franchisee distribution in India (Source: MoP website)

Friday, April 22, 2011

Key Performance Indicators (KPIs) for Distribution Utility

Utility Performance Monitoring is one of major gaps in Indian distribution utility or DISCOMs. The major reason is missing measurements and analytics to drive decisions and implementations. Even the MIS that gets created (inspite of its questionable integrity) is not effectively used to control distribution system optimally. One abstraction is to look utility as a complex distributed network with multiple stakeholders/nodes (various end consumers, linked to DTCs, feeders and substations forming a network and one network interconnected with others). Each stakeholder has different metrics of performance and it is this mismatch of KPIs along various stakeholders, that make the network run non-optimally.

It is attempted here to give readers a detailed list of KPIs that could be applied to benchmark performance of a utility with other utilities or with itself across time. The list is not claimed to be complete, but have been arrived with good amalgamation from available literatures. The various broad categories of KPI's identified in utility distribution are:
  1. Operational Performance
  2. Operational Cost & Management
  3. Financial Performance
  4. Customer Service Quality
  5. Energy Efficiency & Demand Side Management (DSM)
  6. Workforce (Including Health & Safety)
  7. Sustainability

Lack of good baseline data & reporting leads to irrational Power Franchisee bidding


The reported success of Bhiwandi Power Franchisee model has attracted more private players and has increased competition for good of the sector (see our earlier blog on 'Many new corporates entering into emerging Power Distribution Franchisee race'). However the very basis of the Power Distribution Franchisee (DF) contract, the baseline data ('information') provided as part of the RFP (Request for Proposal) is not trusted by the bidders driving  irrationality in the bidding. 

Impact on Bidders:
  1. High business risk for the DF due to non-trust worthiness of the baseline data provided by the utility: Crompton Greaves Ltd. (CGL) backed from awarded Nagpur DF tender and in the process wasted 2 years. Company quoted that the base line data provided to them was not correct and its not viable for them to service at their quoted input rates.
  2. Repeated efforts by all bidders to gain confidence on baseline data: Since utility does not take responsibility of the data it provides in the RFP, it is left to the bidders to figure out this information and speculate their bid with little confidence on their business plan and projected returns.