Interview with Col. Gowardhan - HR Director, OCW on the key challenges and future plans for 24 x 7 water supply project at Nagpur

The interview showcases the key challenges and future plans of the 24x7 water supply operator for the city of Nagpur, as told to Mohammad.Sufiyan@pManifold.com


Nagpur 24x7 water supply project is the first urban water supply project in India. Could you, at the outset, help us understand the current status of the Project?
Nagpur comes along as the first big urban water supply project on Public-Private-Partnership (PPP) model. In this Project, Orange City Water Pvt. Ltd. (OCW) is to upgrade city water distribution network through rehabilitation of the existing network and laying new network to achieve 24x7 uninterrupted water supply to city of Nagpur.The work is in progress under JnNRUM scheme. The plan agreed and approved for 5 years and in last 18 months OCW has been able to lay about 250 km of pipe line and done more than 26000 new service connections. One zone is already operating on 24x7 basis and few areas will be shortly added to 24x7 list as work in 3 areas is nearing completion.  Further to that, OCW is currently working in almost 30% of the city to improve the water mains network.

Thursday, October 10, 2013

Rs.400 Cr Water Supply Projects up for tendering in Baneta and Bikaner; L&T and SPML win projects in Water Space, IUKAN 2014 - October 2013

This is a newsletter sent to mailing list of pManifold, sharing Water Distribution Industry opportunities and updates.

Some of the recent updates in the Water Distribution space are shared below. We hope you'll find the content informative and useful.

New Water Project Highlights in Sep-2013
  • L&T Construction has won orders in water segment worth Rs 1,141 Cr. more... 
  • SPML Infra bagged order worth Rs.772.20 Cr. more... 
  • Shriram EPC(SEPC) has won orders worth Rs. 389 Cr. from Tamil Nadu and Rajasthan municipal corporation more... 
  • Bids invited for Baneta Water supply scheme - estimated contract value of Rs.75 Cr. more...
  • Bids invited for Bikaner Water supply project - estimated contract value of Rs.298 Cr. more...
Top News Highlights of Sep-2013
  • Asian Development Bank (ADB) is likely to provide $400 Million (Approx Rs.2488.2 Cr.) loan to improve the water and sanitation system in Kolkata more...
  • Asian Development Bank has recently sanctioned 130 Cr. To improve water distribution systems in Agartala more... 
  • Now “Water ATM machines” to bring reforms in life of peoples in India more...
Articles of Sep-2013
  • Why urbanization is a problem all over Asia? more... 
  • Poor water supply system becoming a massacre for Delhi’s poor people more... 
  • Goa to achieve self sufficiency by 2015 more...
  Upcoming Water Events
Case Studies
  • If you are prospecting to enter in Water Utilities as Operator or Service Provider or Vendor - learn some best practices through case studies from pManifold (Water Utility Case Studies)
If you would like to know more about us, please contact at mohammad.sufiyan@pmanifold.com

Tuesday, October 8, 2013

pManifold India Water Utility Updates - September 2013

This is a newsletter sent to mailing list of pManifold sharing Water Distribution Industry opportunities and updates.

pManifold takes this opportunity to bring you a refined collection of news, deals, events and reforms in the Indian Water Utility space.

Top News Highlights
  • SPML Infra Ltd has won new orders worth Rs. 1,802.10 crore projects. Out of which 802.10 Cr. were received from PHED for water supply schemes in 3 districts. 
  • Pratibha Industries has bagged a water supply project worth Rs. 205 Cr. from the Public Health Engineering Department, Jaipur.
  • Ahmedabad 24x7 water supply project costs expected to be around 2600 Cr. for 14 lakh connections in the city. 
  • Aurangabad water project likely to start soon - Civic Chief
  • Pimpri-Chinchwad 24x7 water supply plan gains momentum. Two more suburbs likey to have 24x7 water supply within two months. 
  • Vishakhapatnam's 30,000 households to get 24-hour water supply from July 2014. 
  • Cuttack 24x7 water supply project worth Rs. 325 Cr. to start soon. 
  • Chandigarh Municipal Corporation to do surprise checks to detect water thefts. 
  • Piramal Water uses Water ATM’s to deliver safe drinking water to villages at the cost of 30 paise per litre. 
  • Belgaum experts claims 24x7 water supply is unaffordable for the poor citizen. 
  • Reforming Energy subsidies could curb India’s water stress. 
  • The Saga of 24x7 water supply. 
Upcoming Water Events
Case Studies
  • If you are prospecting to enter in Water Utilities as Operator or Service Provider or Vendor - learn some best practices through case studies from pManifold (Water Utility Case Studies).
If you would like to know more about us, please contact at mohammad.sufiyan@pmanifold,com

Tuesday, June 18, 2013

Top 15 - Field analysis of Customer Indexing for a Utility Company

GIS based consumer indexing is one of the effective tool to improve the complex network of consumers for the utility company. The complexity of network and minimal baseline data available, the utility needs to take substantial efforts on field to create a strong database of the consumer.

While working with a major water utility in India, some of our observations are listed below. These observations could help in creating a strong database of consumer.

Problems & Resulting Issues:

A) Systemic Problems (arising due to problem in process/system)

  • Background and purpose not clearly defined which is essential for correct inputs and improve the quality of data. 
  • Lack of strong processes and system base implementation for customer indexing
  • Recruitment of low quality people for on-field surveys which leads to lack of presentations skills, confidence, convincing capabilities, etc.
  • No processes for submission of on-field data which results in faulty batching of data and missing of survey forms
  • No regular updates of data (Monthly or Quarterly)
  • Lack of effort estimation and resource allocation which results in exceeding deadlines and duplication of efforts

B) Data Collection Problem (Due to Presentation / Understanding / Customer Support)

  • Wrong plot markings of property polygons in GIS base maps
  • Incomplete information filled by surveyor to achieve the daily target
  • Missed out consumers and properties by surveyors
  • No validation of Consumer Indexing process compliance by surveyors who are doing mistakes on field
  • No continuous tracking of surveyor records and inputs
  • Management of surveyors becomes difficult due to high attrition rate on-field
  • Difficulty in categorizing registered, unregistered and no-connection Consumers 
  • Lower level supervisors tackling the issues arising out of political influence may create unwanted barriers

Recommendations:

- Create a strong stakeholder (internal & external) agreement on what is required output of the consumer indexing survey
- One of the most effective ways to ensure high quality of data collected is to emphasize more on re-validation of the data by a field team
- Preliminary survey by taking GIS base map also helps to minimize GIS related issues on-field.
- On-field continuous training and quality monitoring of surveyors which will help minimise mistakes at ground level
- Appropriate costing and effort estimation is required for timely delivery of data
- Frequent updates of data is important which will help resolve to bring consistency in data

Prologue:

A systematic execution of customer indexing creates a whole new intelligence about the local variables. At the same time it can suggest strategic interventions which could be used for creating a positive cash flow for the utility.

Friday, March 8, 2013

Before you start consumer indexing...

There has been a huge hue and cry about the unavailability of consumer data with the Indian utilities. However, the question that needs to be asked is that whether we have really made an effort to collect the right data set? And if we have, do we have the processes to continuously update the database and maintain it?

In this post, I've tried to list down baby-steps that would go a long way in creating a reliable and comprehensive customer database through the Consumer Indexing (CI) process.

# 1 Create consensus on how the data is required across the teams within utility 
A lot needs to be done to really come to a common consensus across the utility stakeholders about how the utility plans to use the consumer data, not just to create a database because it's a mandate in the contract. This would also require the utility to project and decide how the data will be maintained finally when the utility operations smoothen up in due course.

Further, one also needs to take a call on what data is the priority and when and how it will be collected.

# 2 Create a methodology to collect the data
Now, most widely used methodology currently adopted is the consumer surveys or consumer indexing, as many call it. However, the whole process is extremely tedious and static. One needs to think destructively to really create a methodology which will be, not just fast, but also reliable enough to feed data continuously to the other internal teams. 

This could encompass use of social media to really entice and engage the customers to voluntarily post their data and update their data.

What precaution needs to be taken is to adopt a infrastructure to really accept data from multiple sources and consolidate the same into one piece of data.

# 3 Support systems needs to be designed and put in place to receive and organize the customer data
As the process of consumer data upgradation picks up pace, the utility should really be ready to receive huge chunks of data from various sources - viz. legacy systems, new connections, on-field checks, consumer indexing process, social media, etc.

I believe that MS Excel is fairly strong a tool to manage such data, provided the data structure is correctly created. At the same time, appropriate end-to-end integration needs to be done for the data collection methodology.

# 4 Selecting the right tool for the right data
GIS systems, though being one of the latest of technologies adopted by the utilities, has a major drawback. The data once imported into a GIS system is static. A GIS system will always take only that data as input that you'll feed to the system without doing any sanity check.

Now this creates a major loop hole in the system that can only be fixed by selecting a robust tool for data collection. This tool should also take into account that at times, the data might need to be collected from the field. Our experience in the field of customer data collection has proved that even a simple smart phone integrated with web-based forms is good enough. However, a well-designed consumer survey form is the easiest of all techniques used to initially populate the customer database.

Once the base-data is ready, the Billing Centers and Customer Care Centers should be developed to act as the nodal touch-points to gather the customer data on a more regular process.

# 5 Create the right training and monitoring modules
Even with the best of the methods and tools, without a systematic training and monitoring methodology, a good consumer indexing process could go for a toss. Right tools for training, and data audits are indispensable parts of the CI process

One of the speakers at the recently concluded India Utility Knowledge and Networking Conference (12-Feb-2013, New Delhi) pointed out that the utilities will go slow when it comes to adoption of technology and partner with smaller, local players to help them roll out the operations. We believe that there is a whole lot of internal thinking that needs to go in to really ensure that the utilities hit the ground running. Lack of clarity from the utility, coupled with the inefficiencies of the local players could kill the effort spent in the consumer indexing process.

Further readings: Putting your best foot forward - Best Practices in Consumer Indexing

Wednesday, October 31, 2012

Contingent Valuation Methodology - a means to the capture and analyze willingness to pay

If people merely ‘want’ something, it may not be backed with a willingness to pay for that service. Hence one needs to ascertain people’s maximum willingness to pay for service options under consideration. Willingness-To-Pay (WTP) is the maximum amount an individual is ready to pay for a particular goods/service. Consumer surveys are carried out to estimate the WTP for goods or service under consideration.

The WTP can be estimated using three different ways:
  1. By observing prices that people pay for similar goods in various other markets
  2. By observing individual expenditures on money, time and labor, etc. to obtain goods, OR to avoid their loss. This method might involve an assessment of coping strategies and involve observations, focus group discussions and even house-hold surveys.
  3. By directly asking people what they are willing to pay for goods and services in the future
The first two approaches are based on observations of behavior and are called Revealed Preference Techniques. The third technique is based upon Stated Preferences and includes Contingent Valuation Method.

Contingent Valuation Methodology (CVM) creates a hypothetical market scenario and tries to obtain the value for particular goods, contingent to the scenario. The economic concept that the CV Surveys are trying to capture is the maximum amount that the individual would be willing to pay for certain goods/services.

The most important part of the CV Survey is to simulate a realistic contingent valuation scenario, which has accurately priced options that reflect the levels of prices the goods/service provider will have to charge.

The advantages and disadvantages of the CVM are presented below:

CONTINGENT VALUATION METHOD

Advantages
Disadvantages
1
CVM captures a fuller range of benefits of service improvements by investigating people’s maximum willingness to pay for different levels of service that are currently not available
The cost of CVM analysis for a smaller project in terms of time and money are significant. However, incremental costs are relatively modest
2
Consumers can bid on a range of different service options, thereby defining project designs and technology choices
The results of CVM are often not transferable between locations. This creates a special focus requirement on sample planning
3
The CVM generates information on household ability and willingness to pay for on-going services, thereby guiding tariff and cost-recovery policy
Sample size needs to be substantial to avoid problems involved with aggregation of responses
4
If stated clearly, the results of CVM Survey are conceptually easy for non-specialists
Individual biases can cause misleading results

The CVM has proven to be the most popular of available methods for monetary valuation of environment.[1]

The application of Willingness-to-Pay Survey for a utility roll-out is depicted in the following figure. 

How Willingness-to-Pay Study fits into the operational roll-out for utilities?
The chart shows how the study integrates with the other functions of the utility and interacts with them to create an eco-system based on optimum approximations.

Biases
When a respondent does not answer a survey question truthfully, it is said to introduce a bias into the survey that undermines the validity of the survey. Therefore, the basic design consideration of the CV Survey is to avoid the many biases that might occur.

The different types of biases and the ways to avoid the biases in your CVM study are shown in the table below. These biases also need to be controlled during the interview conducted for the CVM Study.

Main CVM Biases and Errors
Bias
Characteristic
How to avoid
Low Strategic Bid
Respondent lowers their bid assuming that the state, or others, will pay more
Emphasize on policy of state that if the community is not willing to pay sufficiently, the project might not take off
High Strategic Bid
Respondent raises their bid above the real WTP to ensure that the project goes ahead
Make it clear that there will be no subsidies, this is the real amount. Choose correct bidding model
Hypothetical Bias
Respondent does not understand or believe in the options
Explain options clearly.
Poor Sampling
Non-random sample selected which might result in poor quality of data collected.
Ensure accurate mapping of survey area and an appropriate random sampling methodology
Starting Point Bias
Starting price for bidding games influences the final WTP
Vary the starting prices within the sampling frame
Interview and Compliance Bias
Enumerator influenced biases
Analyze responses by enumerator and discard biased responses
Payment Method Bias
Payment method does somehow affect the responses
This might be a realistic bias revealing preferences to certain payment method. This can be safely ignored.

Best practices for Designing WTP Survey
1.     ·  Survey Design should involve easily understood and pre-tested language, taking feedback from all focus group ·   Data Collection should be planned with appropriate attention to sample size, collection methods, sample representation of general population, and randomized selection ·     Correct statistical tests need to be applied for accurate interpretation of the results ·  Regression results for CVM bids should be conducted for validating the data ·  Question Design and interview process should be developed to reduce the bias introduced in the survey

For a case study on WTP for Water, visit our blog here.


[1] “The Contingent Valuation Method: Retrospect and Prospect” (2008), Clive L. Spash



Thursday, September 20, 2012

Challenges in and Levers for success of the 24x7 water supply projects in India


As one wonders what has been holding back the operationalization of the 24x7 water supply projects in India, we thought of penning down our observations around it.

Even before kicking-off the operations, one observes that the long gestation period (5+ years) to engage and realize even first pilot is a show-stopper. This is primarily because of:
    • lack of standardization of the model, and various agency issues at Central, State & ULB level
    • delays in contract sign-off & getting consensus on SLAs and new Tariff agreement
    • Delayed financial closures - constricted investments flow from investors, because of perceived high risk of regulated (& politicised) utility
Levers for Successful Implementation of 24x7 Projects

As the operators take-over and start the operations, the first challenge hitting them in the face is the inaccurate baselines. Revisions in tariff, SLAs, employee deputation follow. The lack of education of customers, employees and local politicians on the PPP models affect all the other stakeholders. 

The nascency of the industry has created an acute shortage of skilled middle management resources that are ready to engage on-ground in Tier-2/3 towns. Further to this, the lack of investment from operators in Strategy, Structure, Systems and Processes, and doing it right from long term perspective creates a totally different shade of problems.

The technological levers of GIS modelling based on low confidence data collection, and fast obsoletion, no useful optimization and design possible. Only static view is captured on GIS and no real  updates happen in the system. Even though water metering (bulk and end-customers) and regular auditing is being stressed upon & invested in, no useful actions are enforced based on analytics. (Power sector has long been metering and doing energy audits, but losses have only increased, because of missing actions. Water is just starting to walk on same trail, and will likely see similar results.)

Finally, there seems to be a total lack of SLAs performance monitoring and enforcement institution. This gives rise to ever-moving targets, and cross blaming.

Overall, currently Management change, and Technology are being stressed upon for the success of 24x7 water supply projects. We believe that there is a need for two additional levers - Performance Monitoring and Customer Engagement, to bring effective Change Management. We strongly believe, that its operationalisation of these models that has to be improved, and rest will follow. 

Tuesday, June 19, 2012

A Consumer-Oriented Approach to Water Sector Reform (WSR)

With complex institutional arrangements, aging infrastructure, and poor cost recovery practices, India’s urban Water and Sanitation Services (WSS) sector faces tremendous challenges to providing safe, affordable water in a reliable manner. Ill-suited to tackle these issues on its own, the government began turning to the private sector for solutions in the mid-1990s. While such Public Private Partnerships (PPPs) were introduced with great fanfare, they failed miserably – only 1 in 5 projects initiated during the period remain in operation. One of the most important reasons behind these failures was the unilateral focus on physical infrastructure, completely neglecting the consumer-facing component of water utilities.

India has learned much from its Water Sector Reform (WSR) experiences since then, with three quarters of PPPs henceforth involving Operations and Management (O&M) of the distribution value chain. Correspondingly, PPP failure rates have decreased substantially: 80% (1990s) à 62.5% (2000-2004) à nearly zero (2005 onwards). In this blog, we will outline India’s most critical urban WSS issues from a consumer-oriented approach – the approach that has proven successful in providing lifelines to a sector in dire need of revitalization. (Source: Trends in Private Sector Participation in the India Water Sector, World Sanitation Program 2011) 

To summarize this sector’s main challenges in one sentence (or diagram, rather), it is stuck in the following low-level equilibrium trap: